A.6 Safety Checklist
Use this checklist to ensure that the safety requirements have been addressed.
Safety Checklist
Considerations
Yes No N/A Comment
Is there an
emergency
power shut off?
Is there a fire
protection system
in the data center
room?
Is the computer
room adequately
equipped to
extinguish a fire?
Is antistatic
flooring installed?
Is the area below
the raised floor
free of obstacles
and blockages?
Related Topics:
• Temperature and Humidity Requirements (page 1-44)
See Also:
"Powering On and Off Oracle Exadata Rack" in the Oracle Exadata Database
Machine Maintenance Guide
A.7 Logistics Checklist
Use this checklist to ensure that the logistics requirements have been addressed.
Logistics
Checklist
Considerations
Yes No N/A Comment
Is contact
information for
the data center
personnel
available?
Appendix A
Safety Checklist
A-11

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Oracle EXADATA X6-2 and is the answer not in the manual?

Oracle EXADATA X6-2 Specifications

General IconGeneral
BrandOracle
ModelEXADATA X6-2
CategoryServer
LanguageEnglish

Related product manuals