EasyManua.ls Logo

Oracle EXADATA X6-2

Oracle EXADATA X6-2
337 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Logistics
Checklist
Considerations
Yes No N/A Comment
Is uncrating of
cabinet and
cabinet
packaging
removal
required?
Are there any
restrictions on
delivery truck
length, width or
height?
Is there storage
space (cabinet)
for the ride along
spares? If not,
does the
customer allow
cardboard boxes
and other
packing material
in the computer
room, since the
spares are
packed in
cardboard
boxes?
Is there a time
constraint on
dock access? If
yes, please
provide time
constraints.
Is a tail or side lift
required on the
delivery carrier to
unload the
equipment at the
delivery dock?
Will any special
equipment be
required to place
the rack in the
data center
room? Examples:
Stair walkers
Lifters
Ramps
Steel plates
Floor covers
Appendix A
Logistics Checklist
A-14

Table of Contents

Related product manuals