EasyManua.ls Logo

Oracle Server X6-2 - Page 62

Oracle Server X6-2
144 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Install the Cable Management Arm
Note - The slide-rail latching bracket has a green release tab. This tab is used to release and
remove the latching bracket so that you can remove connector D.
11.
Gently tug on the four CMA connection points to ensure that the CMA
connectors are fully seated before you allow the CMA to hang by its own weight.
12.
To verify that the slide-rails and the CMA are operating properly before routing
cables through the CMA:
a.
Extend all rack anti-tilt devices to prevent the rack from tipping forward
when the server is extended.
Caution - To reduce the risk of personal injury, stabilize the expansion rack cabinet and extend
all anti-tilt devices before extending the server from the rack.
For instructions to stabilize the rack, see “Stabilize the Rack for
Installation” on page 41.
b.
Slowly pull the server out of the rack until the slide-rails reach their stops.
c.
Inspect the attached cables for any binding or kinks.
62 Oracle Server X6-2 Installation Guide • July 2020

Table of Contents

Other manuals for Oracle Server X6-2

Related product manuals