Safety
7
1.05 Operating and technical staff
1
.05.01 Operating staff
Operating staff are the persons responsible for setting up, operating and cleaning the machi-
ne and for eliminating any malfunctions in the sewing area.
The operating staff is obliged to observe the following points:
For all work the notes on safety in this Instruction Manual must always be observed!
Any working methods, which adversely affect the safety o the machine, must be avoided!
Any changes occurring ton the sewing machine drive, which may affect its safety, must
be reported to the user immediately!
1.05.02 Technical staff
Technical staff are persons who have been trained in electrical engineering/electronics and
mechanical engineering. They are responsible for servicing, repairing and adjusting the ma-
chine.
The operating staff is obliged to observe the following points:
For all work the notes on safety in this Instruction Manual must always be observed!
Before carry out any repair work, the main switch must be switched off and measures
taken to prevent it from being switched on again!
Never work on parts or equipment still connected to the power supply! Exceptions are
only permissible in accordance with the regulations EN 50110.
All safety covers must be replaced after the completion of maintenance and repair work!

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Pfaff P45 PD 2-L and is the answer not in the manual?

Pfaff P45 PD 2-L Specifications

General IconGeneral
BrandPfaff
ModelP45 PD 2-L
CategorySewing Machine Accessories
LanguageEnglish