PEC Plus user manual Testing the configuration
31040003 39
Testing the configuration
After configuring all the control elements (variable stages relays, and so on), test your PEC Plus to
make sure the configuration is correct. In other words, make sure what you think is connected to a
particular relay or stage is actually connected to that relay or stage.
You can test the configuration using the PEC Plus’ test mode. Test mode allows you to operate the
equipment, regardless of temperature or time. As you operate each piece of equipment, visually
check to see if that equipment is doing what you tell it.
For example, when you switch on relay 1 at the PEC Plus, does the equipment you think is
connected to that relay switch on?
For more information about test mode, read Testing settings and equipment on page 63.