EasyManua.ls Logo

Precision Planting 20/20 - Page 50

Precision Planting 20/20
78 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
955725_4
50
Step 4:
Starting at the 1
st
backbone, create an index of every
module connected to each CAN network (“Module
Number” column). If any connectors have row plugs,
skip that row. Continue numbering sequentially
through the end of the CAN network (note red arrow).
Repeat same process for additional CAN networks.
Using this example, configure the Bus Devices on the 20|20 as follows:
CAN A Module Assignment: CAN A Module Location:
Backbone Connector 1 SRM SRM PDM (only on CAN A)
Backbone Connector 2 SRM 1|SRM Row 1
Backbone Connector 3 SRM 2|SRM Row 3
Backbone Connector 4 SRM 3|SRM Row 5
Backbone Connector 5 SRM 4|SRM Row 9
Backbone Connector 6 BXM 5|SRM Row 7
6|BXM Tower 1

Other manuals for Precision Planting 20/20

Related product manuals