EasyManua.ls Logo

Precision Planting 20/20 - BXM Setup Example

Precision Planting 20/20
78 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
955725_4
60
BXM Setup Example
The sample below from the BXM Port Assignment Worksheet (Appendix D) is from an Air
Seeder with 8-row towers. Fill out the worksheet as follows:
Step 1:
Assign a Tower # to each BXM; this numbering could be based on the manufacturers numbering
system, or a custom system. BXM numbering is based on the order the SRM backbones are
connected in the CAN network, tower numbering refers to the physical location of the seed
distribution towers. It is highly recommended that seed distribution towers are labeled with a
number so the operator can quickly identify the proper tower.
Step 2:
Assign each Input a Row according to what blockage sensors are plugged in. Following a
sequential order is recommended but not necessary.
Note: CCS/BOX DRILL STYLE SEEDERS: Fill out Appendix C similar to the example above,
but disregard the Tower Number as there are none present.

Other manuals for Precision Planting 20/20

Related product manuals