Installation and Initialization
Tsunami QB-8100 Series (100 Mbps/5 Mbps Models) Installation and Management Guide 25
.
Figure 2-5 Grounding the Unit
Step 9: Power on the Unit
Plug in the power cord into a power outlet after having connected the Power Injector and the Radio device using Cat5 cable.
There is no ON/OFF switch on the unit. To disconnect power, unplug the RJ45 connector from the “LAN+DC” port on the
power injector.
Step 10: View LEDs
When the device is powered on, it performs startup diagnostics. When startup is complete, the LEDs show the unit’s
operational state. The LEDs are available at the unit’s Ethernet connector inside the enclosure. You can see the LEDs through
the ethernet connector. The LEDs will not be visible when the weather sealing caps are installed.
Figure 2-6 View LEDs
The following table describes the status of LEDs and the corresponding operatinal state of the device:
NOTE: All the LEDs will blink during initialization.
LED State Ethernet Interface
Power/Ethernet LED Wireless LED
Off No Power Radio is not present or failed to detect
Amber No Application Image detected (In
Bootloader CLI/Scantool mode)
Power is on and unit detects Reload signal
Blinking Green Power is on and the Ethernet link is
down
Radio is detected but wireless link has not been
established yet
Solid Green Power is on and the Ethernet link is
up
Radio is detected and wireless link has been
established