EasyManua.ls Logo

Roche Cedex Bio System - Page 138

Roche Cedex Bio System
496 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Roche Diagnostics
B-8 Operator’s Manual · Version 3.1
5 Daily operation Cedex Bio System
Introduction
7
Performing calibrations
Performing individual
calibrations
1. Start the wizard. Workplace > Calibrations >
2. Select the test. n/a
3. Prepare and place the calibrators. n/a
4. Start the calibration.
5. Validate the calibration results. Workplace > Calibrations >
6. Remove the calibrators.
Performing
all due calibrations
1. Start the wizard. Workplace > Calibrations >
2. Select all tests with due calibrations.
or
Select all tests with calibration due
within the forecast period.
n/a
3. Prepare and place the calibrators. n/a
4. Start the calibration.
5. Validate the calibration results. Workplace > Calibrations >
6. Remove the calibrators.
8
Performing controls
Performing
Default QC
1. Start the wizard. Overview > Order >
2. Select a control and place the tube.
Repeat until there are no controls left
on the screen.
n/a
3. Start the QC measurement.
4. Validate the QC results. Workplace > QC Status >
5. Remove the controls. n/a
Performing an individual
QC measurement
1. Start the wizard. Workplace > QC Status >
2. Select a test. n/a
3. Select a control and place the tube.
Repeat until there are no controls left
on the screen.
n/a
4. Start the QC measurement.
5. Validate the QC results. Workplace > QC Status >
6. Remove the control.
Performing all
due QC measurements
1. Start the wizard. Overview > Order >
>
2. Select a control and place the tube.
Repeat until there are no controls left
on the screen.
n/a
3. Start the QC measurement.
4. Validate the QC results. Workplace > QC Status >
5. Remove the controls.
Task Steps Navigation
With wizard As individual steps
Table B-1 Overview of the daily operation tasks

Table of Contents

Related product manuals