EasyManua.ls Logo

Roche Cedex Bio System - Page 419

Roche Cedex Bio System
496 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Roche Diagnostics
Operator’s Manual · Version 3.1 E-29
Cedex Bio System 13 ISE operation
Daily operation
6
Perform maintenance actions. 1. Check which maintenance actions are due.
2. Perform the maintenance actions.
Perform at least all red maintenance actions.
3. Press to proceed to the next stage in the
End Shift wizard.
7
Check the cuvette status.
(Not relevant for ISE operation.)
1. Press to proceed to the next stage in the
End Shift wizard.
8
Remove the reagent disk.
(Not relevant for ISE operation.)
9
Empty the waste container. 1. Empty the waste container.
2. Press the Waste button to confirm.
3. Refill the water container.
4. Press the Water button to confirm.
10
Finish your shift. 1. Log off the system.
2. Shut down the system and switch off the main
instrument. (If there is no other shift.)
Step User action
Table E-5 Steps for finishing the shift
If you intend not to use the ISE unit for more than one week, you should deactivate it. This
saves ISE fluids, reduces wear and tear of the tubing, and lowers the likelihood of malfunc-
tions and errors occurring. (See Deactivating the ISE unit on page E-64.)

Table of Contents

Related product manuals