EasyManua.ls Logo

Rotax 125 MAX DD2 evo - Page 53

Rotax 125 MAX DD2 evo
120 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BRP-Rotax
INSTALLATION MANUAL
Figure 7.13
1
Shift contact
guidance
2
Retaining plate
Step
Procedure
5
Mount Allen screw (pos. 1), lock wash-
er (pos. 2) and spacer (pos. 3) togeth-
er with the shift contact guidance (pos.
4) to the engine housing. Tightening
torque 22 Nm.
Figure 7.14
1 Allen screw
2
Lock washer
3
Spacer
4
Shift contact guidance
Step
Procedure
6 The alignment between point -1- and
point -2- must be given. Otherwise it
can cause increased friction, which
has a negative impact on shifting
behavior.
Figure 7.15
1 Point 1
2
Point 2
Step
Procedure
7
Mount sleeve (pos. 1) onto the retain-
ing plate (pos. 2).
Figure 7.16
1 Mount sleeve
2
Retaining plate
Step
Procedure
8
Mount second Bowden cable (pos. 1)
through shift contact guidance and
sleeve onto the retaining plate (pos.
2).
No washer is necessary on this Bow-
den cable.
6
Page 8
Edition: September 01 2019
Effectivity: 125 MAX DD2 evo

Table of Contents

Related product manuals