2015-2017 5.0L Mustang Phase 1/2 RHD ROUSHcharger Kit
SECTION D – INSTALLATION
1316-RHD-AA 12152016 62 800.59.ROUSH
2. Lube the water pump gasket.
3. Install the water pump on the front cover and
install the three (3) bolts only. Leave out the bolt
at the 10 o’clock position. Torque the bolts to 25
Nm.
4. Install the thermostat housing and hose assembly
and secure it with the clamp.
5. Install the two (2) thermostat housing mounting
bolts and torque to 10 Nm.