EasyManua.ls Logo

Sailor H2095C - Page 85

Sailor H2095C
108 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning
CommissioningCommissioning
Commissioning Link Test
Link TestLink Test
Link Test
Page
PagePage
Page 5-2
5-25-2
5-2 25-Jul-00
25-Jul-0025-Jul-00
25-Jul-00
The TT-3020C Capsat Transceiver is now logged in and ready to
work.
5.3 Link Test
The Link Test consist of three parts:
Message Reception Test
Message Transmission Test and
Distress Test.
The TT-3020C will automatically perform a distress test without
any user intervention.
In the end of the test the Transceiver will receive the link test re-
sults.
5.4 Details of a Link Test
You should try to start one link test yourself to verify the unit
After a while you will see a message on your screen and on your
printer saying:
-
--
- Link Test started
and when the MAIL indicator on the TT-3020C front panel starts
flashing, the receive test has commenced.
A test message is then received from the LES by the Transceiver.
After the MAIL indicator has turned OFF, the transmission test be-
gins.
Document Nr: I-MA-3010.68-5510-762-IVT-312
Page 490 of 1234

Table of Contents

Related product manuals