D8
Starting the machine
33
6.2.1.2 Heating phase
To bring the machine to the required ope-
rating temperature, proceed as follows:
- turn the switch to position “2”;
- attach the filter holders to the
dispensing groups;
- move the steam wands on the grid,
open the steam dispensing taps and
leave them open;
- wait for steam to come out of the
relevant wands (about 15/20 minutes),
then close the steam dispensing taps;
s20 min.
- wait until the machine reaches the
required operating temperature,
which is indicated on the pressure
gauge (pressure 1.2 bar) on board the
machine
1.2
bar