ERECTION AND DISMANTLING
34
V23C_09.13
SC4000 Pos 4
X1 = SUPPLY VOLTAGE SOCKET
X3 = Pendant CONTROL SOCKET
Q1 = MAIN SWITCH
Drawing 4.31. Chassis electric box.
S4- PUSH-BUTTON - FORWARD/UP
S5- PUSH-BUTTON - REWARD/DOWN
S6- EMERGENCY STOP
X6- PLUG
13. Check the power phase.
The following should be done:
a) switch on power with plat form
electric box main switch Q2
b) switch on power with chassis
box main switch Q1
c)
check, if the control lamp for
the phase order is on;
if not, then:
- change the phase order with the
phase inverter switch Q2.1 on the
platform electric box,
- push the button UP on the pendant
control and note the move ments
of the plat form.
Drawing 4.32. Pendant control E3 (hori-
zon tal/vertical drive).
S6
S4
S5
X6
12. Connect 400 V / 32 A 5-poles supply
cable to socket X1 on electric boxes
on both units.
Drawing 4.33. Platform electric box.
Q2 = MAIN SWITCH
S2 = HOOTER PUSH BUTTON
X5 = SOCKET
F8 = PHASE CONTROL LED-
DIODE (INSIDE THE BOX)
E1,E2 = SOCKET FOR HAND TOOLS
S7,S8 = DIRECTION BUTTONS
S1 = EMERGENCY STOP
XS7 = SOCKET FOR GATE
X8 = SOCKET FOR TEST
XS.1 = SPECIAL PLUG
Q2.1 = PHASE INVERTER SWITCH
H3 = CONTROL LAMP “PHASES OK”
-X1
-X3
+OP1
-Q1
0
-Q2.1
-S2
-Q2
-A1
option:
thermostat
-E1/-E2
+OP2
-P1
-X5
-X22
-XS7
-X8
9999h
1
-H3
Option:
drive hour
meter
-S7
-S1
-S8