BASCSOUL_EN
V02 | 10.2017
31
www.schaerer.com
Operation
Option: Hot water and steam dispensing
5.2.2 Interior machine operating elements
The additional external operating elements for hot water and/or steam dispensing are optional:
• [A] Hot water button (preconfigured dispensing in ml)
• [B] Hot water dispensing
• [A] Steam button (preconfigured dispensing in sec)
• [D] Steam wand (Powersteam standard)
The following operating elements listed are available behind the user panel.
Standard operating elements and components:
• [A] Handle for bean hopper and powder container central locking mechanism
• [B] Machine power button (switching of by pressing and holding for 4 sec)
• [C] USB connection
• [D] Grinding level grinder setting (standard centre grinder)
• [E] Grinding level grinder setting (optional right grinder)
See also "Operation" - "User panel" – "Open user panel".