Revision: 3.0 Page 35 of 70
10. Mounting instructions
10.1. General
Always install the SchwankControl in such a way that no vibrations or shocks can be transmitted.
Follow the wiring diagram for installation. Pay particular attention to the phase-correct connection
of L and N, as the control is only single-phase fused.
Install the room temperature sensor in the radiation range of two gas infrared heaters at a height of
2.5 m. This gives the control an optimum value for the actual temperature.
If you install the controller in a particularly large hall or in a hall with an extreme temperature
gradient, you can calculate an average value for each zone instead of using a single temperature
sensor.
10.2. Battery
Button cell Lithium CR2032 3V
Battery replacement necessary after approx. 5 years [current date and time are no longer displayed]
10.3. Fuse
Microfuse 5x20mm FLINK 6.3A
10.4. Tools
Address switch, unlock PCB terminals: Long, narrow screwdriver
Sheathed cables, single core insulation: Stripping tool
Cable breakthroughs: Drill or punching tool
Wall mounting: Drill
10.5. Cable types and board wiring
The following diagrams provide basic wiring instructions.
In a separate document "Schwank- Electrical Compendium" you will find extensive and detailed wiring
diagrams.