3-2
© 2014 SeaStar Solutions Optimus 360 Installation Supplement, Rev. B
STEP DESCRIPTION REFERENCE DOCUMENT
1 Initial Setup This document (Section 4)
2 Purging Steering
System
Optimus EPS Installation Manual (Book 50)
3 Calibration Optimus EPS Installation Manual (Book 50)
4 Control Head and
Gateway Setup
This document (manufacturer-specific
sections 5-8)
5 Sea Trial Optimus EPS Installation Manual (Book 50)
6 Joystick Setup This document (Section 9)
Table 3-2. System setup order of operations.
Part 2 – System Calibration, Purging and Setup (Section 4.0)
The system calibration, purging and setup must be done in the correct
order as defined in Table 3-2.
3.2.2
COMPONENT REFERENCE DOCUMENT
Steering Helm Optimus EPS Installation Manual (Book 50)
CANtrak Display
Hydraulic Pumps
SmartCylinders
Steering Service Valves
System Plumbing
Base (EPS) System Wiring
Joystick This document (Section 3.3)
Control Head (by Yanmar) This document (Section 8.1)
Control Head (by others) Refer to engine manufacturer's documentation
360 System Wiring
This document (Sections 3.4, 3.5, and engine
manufacturer-specific sections )
Table 3-1. Component list and installation references.