Assembling the panels
48 NXAIR / ≤ 40 kA 110-0084.9 / 15
7.2 Interconnecting the panels, preparation
To interconnect the panels, execute the following work:
•
Undoing the transport fixing of the busbars
• Aligning the panels
• Assembling the busbar
• Fastening the panels to the foundation
• Bolting the panels together
• Opening the busbar compartment
• Interconnecting the busbars
• Closing the busbar compartment
• Assembling and interconnecting the earthing busbar
• Assembling and interconnecting the additional compartment
to the busbar compartment (optional)
• Assembling and interconnecting the pressure relief duct
7.3 Undoing the transport fixing of the busbars
For transportation, the busbars are temporarily attached to the sides of the respective panel with bolts and the
transport retainer. The right end panel is delivered without assigned busbars.
Fig. 46: Transport fixing of the busbars