Unloading and erection
110-0084.9 / 15 NXAIR / ≤ 40 kA 37
Panels with end wall
For panel versions with end wall, the craning angle at the panel front, on the side of the end wall, is omitted.
The crane rod is pushed through the end wall.
Push the sealing stopper (1) out of the end wall to clear the opening for the crane rod.
Lay the sealing stopper down in the low-voltage compartment, and keep it. The sealing stopper
is pushed back into the end wall at the end of installation.
Fig. 33: End panel as an example
6.10 Lifting with crane rods
After mounting the craning angles on the panel, two crane rods of the same length can be pushed in per panel.
A crane with heavy weight slings can lift the panel by means of these crane rods.
Crane rods are not an integral part of the scope of supply of the switchgear.
Transports falling down or over
If the crane rods are applied incorrectly, or if incorrect crane rods are used, there is
risk of injury. Crane rods are non-fixed load lifting attachments according to
EN 13155.
Observe the requirements and instructions from EN 13155.
Use exclusively crane rods complying with the specification of these
instructions.