EasyManua.ls Logo

Siemens NXAIR - Page 36

Siemens NXAIR
222 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Unloading and erection
36 NXAIR / 40 kA 110-0084.9 / 15
Mounting the craning angles
Cut PE foil open to mount the craning angles.
INFORMATION
Depending on the panel version, the craning angles at the rear of the panel can be
mounted at different heights.
First, bolt the craning angles laterally at the front of the panel.
Then bolt the craning angles laterally at the rear of the panel, at the same
height as at the front.
According to the panel version, select the suitable craning angles from the set (see
preceding illustrations or also information drawings NXAIR, order number
110-2300.9).
Bolt each craning angle with 2 or 3 bolts M8x20 onto the panel at the corresponding
position.
Tighten the bolted joints M8 with a tightening torque of 30 Nm.
Fig. 32: Craning angle (1) mounted at the side of the panel front
(3 bolted joints), shown here with crane hooks
1

Table of Contents

Other manuals for Siemens NXAIR

Related product manuals