EasyManuals Logo

Siemens NXAIR Installation Instructions

Siemens NXAIR
222 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #5 background imageLoading...
Page #5 background image
Contents
110-0084.9 / 15 NXAIR / ≤ 40 kA 5
8.4 Accessing the connection compartment through the switching-device compartment at panel versions with
ventilation system type II.................................................................................................................... 129
8.5 Accessing the connection compartment through the switching-device compartment at panel versions with
voltage transformer compartment ....................................................................................................... 133
9 Accessing the connection compartment through the rear ............................................................ 140
9.1 Accessing the connection compartment through the rear side of the panel .......................................... 141
9.2 Accessing the connection duct through the rear side of the panel ........................................................ 146
10 Electrical connections ..................................................................................................................... 149
10.1 Checking the contact surfaces ........................................................................................................... 149
10.2 Cutting the rubber sleeves to size ...................................................................................................... 150
10.3 Use of cable lugs ............................................................................................................................... 151
10.4 Cable clamps .................................................................................................................................... 152
10.5 Cable sealing ends ............................................................................................................................ 153
10.6 Dimensions of single-core cables ....................................................................................................... 154
10.7 Dimensions of three-core cables ........................................................................................................ 156
10.8 Assembly of cable sealing ends for single-core cables (except for contactor panel with panel
width 435 mm)................................................................................................................................... 157
10.9 Assembly of cable sealing ends for single-core cables in contactor panel with panel width 435 mm...... 160
10.10 Assembly of cable sealing ends for three-core cables (except for contactor panel with panel
width 435 mm)................................................................................................................................... 161
10.11 Assembly of cable sealing ends for three-core cables in contactor panel with panel width 435 mm ....... 166
10.12 Connecting control cables .................................................................................................................. 171
10.13 Connecting bus wires ........................................................................................................................ 171
11 Closing the connection compartment / connection duct ............................................................... 172
11.1 Installing the vertical partition in the switching-device compartment ..................................................... 173
11.2 Installing the vertical partition and the ventilation duct type I in the switching-device compartment ........ 177
11.3 Installing the vertical partition and the ventilation duct type II in the switching-device compartment ....... 182
11.4 Installing the bushing plate, the vertical partition and the voltage transformer compartment in the
switching-device compartment ........................................................................................................... 186
11.5 Installing the rear wall on the connection compartment ....................................................................... 193
11.6 Installing the rear walls on the connection duct ................................................................................... 197
12 Final assembly work ........................................................................................................................ 199
12.1 Cleaning the switchgear ..................................................................................................................... 199
12.2 Tightening torques and control tightening torques for bolted joints .............................................................. 200
12.3 In panels without ventilation duct: Check the floor fixing in the switching-device compartment .............. 201
12.4 Checking the panel connection links ................................................................................................... 201
12.5 Checking the installation of the wiring duct covers .............................................................................. 201
12.6 Checking control cable connections ................................................................................................... 201
12.7 Checking the vertical partition between the switching-device compartment and the connection
compartment ..................................................................................................................................... 201
12.8 Checking the rear wall at the connection compartment........................................................................ 201
12.9 Checking the bushings....................................................................................................................... 201
12.10 Checking the withdrawable part on the service truck / checking the switching-device truck ................... 202
12.11 Checking the service truck ................................................................................................................. 202
12.12 Checking and completing protection against adverse environmental influences (protection against
corrosion) .......................................................................................................................................... 203
12.13 High-voltage door with ventilation flap ................................................................................................ 203
12.14 Checking assembly work ................................................................................................................... 204
12.15 Correcting circuit diagrams ................................................................................................................ 204
12.16 Installation report ............................................................................................................................... 204
13 Installation of withdrawable parts / switching-device trucks ......................................................... 205
13.1 Solenoid interlocks (optional) in the operating mechanism for withdrawable parts / switching-device trucks
......................................................................................................................................................... 205
13.2 Removing the locking bolts ................................................................................................................ 205
14 Commissioning procedure .............................................................................................................. 206
14.1 Safety instructions ............................................................................................................................. 206
14.2 Update of the firmware of protection relays ......................................................................................... 206
14.3 Drying dampness .............................................................................................................................. 207
14.4 Instructing the operating personnel..................................................................................................... 207
14.5 Checking the accessories .................................................................................................................. 207
14.6 Checking the interlocks mechanically ................................................................................................. 207
14.7 Test operation ................................................................................................................................... 208
14.8 Switching on operational high voltage................................................................................................. 209

Table of Contents

Other manuals for Siemens NXAIR

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens NXAIR and is the answer not in the manual?

Siemens NXAIR Specifications

General IconGeneral
BrandSiemens
ModelNXAIR
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals