EasyManua.ls Logo

Siemens NXAIR - Discharging the Spring Energy Store

Siemens NXAIR
222 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Assembling the panels
60 NXAIR / 40 kA 110-0084.9 / 15
Busbar assembly
Bag unit with connecting elements
An individual bag with connecting elements for connection of the busbars with the feeders is attached to each
busbar compartment.
Busbar version NXAIR for U
r
12 kV
INFORMATION
Number of connecting elements in end panel:
The connections between busbars and feeder bars in the end panel are to
be executed with 4 connecting elements on each phase.
(1)
Busbar
(2)
Feeder bar
(3)
Nut, conical spring washer
(4)
Bolt M12x40,
conical spring washer
Arrowhead indicates the inserting
direction of the bolts
Bag with connecting elements:
110-0770.3 or 110-1221.3
Fig. 58: Assembly of 1250 A busbar,
feeder ≤ 1250 A, U
r
12 kV
Fig. 59: Side view of 1250 A busbar assembly,
feeder ≤ 1250 A, U
r
12 kV
L1
L3
1
2
3
4
L2

Table of Contents

Other manuals for Siemens NXAIR

Related product manuals