Commissioning and Configuration
Process Control System PCS 7 - PCS 7 BOX
4-10 A5E00272813-01
10. Select SIMATIC Station and then the menu command PLC > Download to
current project > Selected Stations. Acknowledge the warning dialog
displayed with the "Yes" button.
11. Exit NetPro.
Notes on Download Connection in Run.
Configured S7 connections within a PCS 7 project can be downloaded in Run.
1. To do this, select the corresponding CPU within a module and select the
desired connection in the connection table.
2. Select the menu command PLC > Download to current project > Selected
Stations.
The selected connection will then be downloaded to both the local and remote
communication partner. The communication partner can either be a CPU or a
WinCC application.
Additional Information
STEP 7 online help