Additional Commissioning and Configuration
Process Control System PCS 7 - PCS 7 BOX
5-12 A5E00272813-01
- Click the "Apply" button.
- Click on the "Browse" button and select the network path to the OS in the
"Settings: Download OS" dialog. Select the option "Entire WinCC project"
and then click on "OK".
Additional Information
Compiling and downloading the AS and OS data for a single station system
STEP 7 online help