EasyManua.ls Logo

Siemens Simatic S7-1500 / ET 200MP - Page 180

Siemens Simatic S7-1500 / ET 200MP
385 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Wiring
7.10 Front connector for the I/O modules
Automation system
System Manual, 01/2023, A5E03461182-AK
179
Details view
The shielding bracket, the power supply element, and the shielding clamp are included in the
scope of delivery for the analog and technology modules.
The following figure shows the details view of a front connector with shield connection
element:
Shield clamp
Power supply element
Cable sheathing removed (approx. 20
mm)
Shielding bracket
Strain relief (cable tie)
Supply lines
Signal cables
+
Shield contact
Front connectors
Figure 7-11 Details view for front connectors with shield connection elements
Preparing front connectors for I/O modules with shield contact element
Watch video sequence (https://support.industry.siemens.com/cs/ww/en/view/67462859)
To prepare the front connector for wiring, follow these steps:
1. Remove the connection separator from the lower part of the connector (Figure 1).
2. Insert the power supply element (Figure 2).
3. Insert the shielding bracket from below into the guiding groove of the front connector until
the shielding bracket latches into place (Figure 3).

Table of Contents

Other manuals for Siemens Simatic S7-1500 / ET 200MP

Related product manuals