Commissioning
12
12.1 Overview
Introduction
This section includes information on the following topics:
Check before powering on for the first time
Procedure for commissioning the S7-1500 automation system
Removing/inserting the SIMATIC memory card
First power-on of the CPU
Procedure for commissioning the S7-1500 distributed I/O system
First power-on of the ET 200MP on PROFINET IO
First power-on of the ET 200MP on PROFIBUS DP
Operating modes of the CPU STARTUP, STOP, RUN and operating mode transitions
CPU memory reset: Automatic and manual
Backing up and restoring the CPU configuration
Time synchronization
Identification and maintenance data
Shared commissioning of projects
Commissioning requirements
Note
Performing tests
You must ensure the safety of your plant. You therefore need to perform a complete
functional test and the necessary safety checks before the final commissioning of a plant.
Also allow for any possible foreseeable errors in the tests.
This avoids endangering persons or
equipment during operation.
Note
Check coding element in the I/O module
Make sure that the coding element is present in the I/O module before you plug in the front
connector for the first time. This reduces the risk of plugging a wired front connector into the
wrong type of module when replacing a module.

Table of Contents

Other manuals for Siemens Simatic S7-1500 / ET 200MP

Related product manuals