EasyManua.ls Logo

Siemens SIMOTICS L-1FN3 - Page 78

Siemens SIMOTICS L-1FN3
124 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. Position the insertion aid so that a clearance of at least 1 cm remains between the cover band
and the secondary section track.
Figure5-10 Positioning the insertion aid
5. Slide the cover band under the slides until the secondary section end piece is reached.
Figure5-11 Sliding the cover band
6. Place the cover band in the wedge-shaped recess of the secondary section end piece and
align it in the traversing direction and at right angles to this, centered with respect to the end
piece.
Some clearance must be left between the end of the cover band and the threaded hole so
that the 󹪝xing screws of the clamping wedge can be inserted.
7. Place the clamping wedge down and press it into position.
Installation
5.3Procedure when installing the motor
Naturally-Cooled 1FN3 Linear Motors
76 Operating Instructions, 06/2023, A5E52220465B AB

Table of Contents

Other manuals for Siemens SIMOTICS L-1FN3

Related product manuals