EasyManua.ls Logo

Siemens SINAMICS G120 - Page 135

Siemens SINAMICS G120
550 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Wiring the terminal strip in compliance with EMC
If you use shielded cables, then you must connect the shield to the mounting plate of the
control cabinet or with the shield support of the inverter through a good electrical connection
and a large surface area.
Further information about EMC-compliant wiring is available on the Internet:
EMC installation guideline (
http://support.automation.siemens.com/WW/view/en/
60612658)
Use the shield connection plate of the Control Unit to connect the shield as strain relief.
Control Units (Page 33)
Installing
4.5 Connecting the interfaces for the inverter control
Converter with the CU230P-2 Control Units
Operating Instructions, 09/2017, FW V4.7 SP9, A5E34257946B AE 135

Table of Contents

Other manuals for Siemens SINAMICS G120

Related product manuals