EasyManua.ls Logo

Sirona CEREC SpeedFire - Operation; Loading the Furnace for Sintering

Sirona CEREC SpeedFire
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
65 71 165 D3639
36 D3639.201.01.02.02 10.2016
5Operation Sirona Dental Systems GmbH
5.1Loading the furnace for sintering Operating Instructions CEREC SpeedFire
5
Operation
5.1
Loading the furnace for sintering
Fragment: CAUTION Furnace chamber size
Fragment: CAUTION Materials
1. Place the restoration with the occlusal surface facing downward on
the top door insulation. The restoration must not protrude from the
insulation surface, as this might cause a collision with the furnace
chamber insulation.
2. Start the process by touching the start icon.
The furnace shuts automatically once the process starts.
NOTICE
Maximum Observe restoration size
Observe the maximum Furnace chamber size when loading the furnace.
- Diameter: 38mm
- Height: 20 mm
The restoration (including with the Glazing Support Single/Multi Unit)
must not exceed this length (38mm) and height (20mm), otherwise the
chamber may be damaged.
NOTICE
Only use approved materials
Only load the furnace with approved materials, which must be assigned
uniquely to the heat treatment job in the furnace.

Table of Contents

Related product manuals