65 71 165 D3639
38 D3639.201.01.02.02 10.2016
5Operation Sirona Dental Systems GmbH
5.2Starting the glazing process Operating Instructions CEREC SpeedFire
5.2
Starting the glazing process
See “Using the glazing spray [ → 40]” for how to use the glazing spray.
1. Select the job.
2. Select the process.
3. Load the furnace (see “Loading the furnace for glazing [ → 39]”).
4. Start the process by touching the start icon.
The furnace closes automatically and performs the selected
process.
The furnace opens automatically following successful heat
treatment. The process is not yet completed here as the last
cooling-off phase occurs in an open condition.
5. As the restoration is still very hot in this phase, only unload the
furnace using metallic or ceramic tweezers. Plastic tweezers are not
suitable for removing restorations. Place the restoration on the fire-
proof tray (A) for further cooling (see “Fireproof tray with integrated
fan [ → 46]”).
WARNING
Risk of burning
The restoration and parts of the door insulation may still be hot.
➢ Always pick up some tweezers to remove the restoration from the
furnace.
➢ Allow the restoration to cool down for another five minutes before
picking it up with your hands.