EasyManuals Logo

SKF MKU Series Assembly Instructions

SKF MKU Series
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #53 background imageLoading...
Page #53 background image
53
7. First start-up
Inspect all electrical and hydraulic connections before putting
the product into operation.
The lubricant reservoir must be filled with clean lubricant
without introducing bubbles. The gear pump unit should be
operated only approx. 15 min. after filling in order to allow
possible air pockets to escape. Air inclusions in the lubricant
adversely affect the function of the devices and impair the
reliability of lubricant delivery, which can result in damage to
the bearings that are being lubricated.
Before first start-up, bleed the centralized lubrication system
as described in "Venting an MKU/MKF/MKL centralized
lubrication system" in Chapter 6.6 Attachment of a gear pump
unit.
Proceed as follows for first start-up:
Check all connections for tight fit
Check that sufficient lubricant is present in the lubricant
reservoir
Start the system
The functional check on the gear pump unit is performed as
follows:
When the machine is at a standstill, check whether signals are
exchanged properly between the machine and the gear pump
unit
If available, trigger an interim lubrication using the
pushbutton

Table of Contents

Other manuals for SKF MKU Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SKF MKU Series and is the answer not in the manual?

SKF MKU Series Specifications

General IconGeneral
BrandSKF
ModelMKU Series
CategoryWater Pump
LanguageEnglish

Related product manuals