EasyManuals Logo

Skyjack SJ61T Service Manual

Skyjack SJ61T
232 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #158 background imageLoading...
Page #158 background image
Page 158 December 2007
Telescopic Boom Series
Models SJ61T & SJ66T
194312
Section 5 - ProceduresService and Maintenance
Pin 10 - 12 volt output on wire 26 to brake valve 3H-26 to release brakes.
Test between pin 10 and 02 wire.
Pin 11 - 12 volt output on wire 27 to tilt alarm relay 27CR.
Test between pin 11 and 02 wire.
Pin 12 - Telescope out selected. Proportional output on wire 39 to telescope out valve 3H-39.
0 volts to 6.8 volts depending on boom speed control potentiometer position. Threshold= .95 volts.
Test between pin 12 and 02 wire while operating telescope out.
Pin 13 - 12 volt input from wire 4.
Test between pin 13 and 02 wire.
Pin 14 - Variable input from wire 128A.
1 volt to 5 volts depending on angle of machine.
1 volt = Level.
Test between pin 14 and 02 wire.
Pin 15 - Turret position. 12 volt input from wire 17 (limit switch LS1).
0 volts= Platform over drive axle.
12 volts= Platform over steer axle.
Test between 15 and 02 wire.
Pin 16 - Foot switch activated. 12 volt input from wire 08A.
Test between pin 16 and 02 wire.
Pin 17 - Platform rotate selected. 12 volt input from wire 36A.
Test between pin 17 and 02 wire.
Pin 18 - 12 volt input from angle sensor on wire 28. 12V= <5 degrees.
Test between pin 18 and 02 wire.
Pin 19 - Not used.
Pin 20 - Turret rotate left selected. Proportional output on wire 32 to turret rotate left valve 4H-32.
0 volts to 5 volts depending on position of joystick. Threshold= .5 volts. Test between pin 20 and 02
wire while operating turret rotate left.
Pin 21 - Platform rotate or jib function selected. Proportional output on wire 42 to proportional ow enable valve
2H-42.
0 volts to 3.85 volts while operating platform rotate depending on boom speed control potentiometer
position. Threshold= 2.3 volts.
0 volts to 9 volts while operating jib function depending on boom speed control potentiometer position.
Threshold= 2.3 volts.
Test between pin 21 and 02 wire.
Pin 22 - Boom up selected. Proportional output on wire 14 to boom up valve 4H-14.
0 volts to 6.3 volts depending on joystick position. Threshold= 1.5 volts. Test between pin 22 and 02
wire while operating boom up.
Pin 23 - Reverse drive selected. Proportional output on wire 15 to reverse drive valve 3H-15.
0 volts to 7.5 volts depending on joystick position. Threshold= 1.5 volts. Test between pin 23 and 02
wire while operating reverse drive.

Table of Contents

Other manuals for Skyjack SJ61T

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Skyjack SJ61T and is the answer not in the manual?

Skyjack SJ61T Specifications

General IconGeneral
BrandSkyjack
ModelSJ61T
CategoryLifting Systems
LanguageEnglish

Related product manuals