Telescopic Boom Series
Models SJ61T & SJ66T
194312
December 2007 Page 21
Section 1 - Scheduled Maintenance Scheduled Maintenance Inspections
1.1-9 Rotatory Actuator (B)
- Ensure there are no loose or missing parts
and there is no visible damage.
- Ensure all bolts and pins are properly
tightened.
- Ensure all hoses are properly tightened and
there is no evidence of hydraulic leakage.
1.1-10 Jib (If Equipped) (B)
- Ensure there are no loose or missing parts
and there is no visible damage.
- Ensure all bolts and pins are properly
tightened.
- Ensure all hoses are properly tightened and
there is no evidence of hydraulic leakage.
1.1-11 Boom (B)
- Ensure there are no loose or missing parts
and there is no visible damage.
- Ensure all bolts and pins are properly
tightened.
- Ensure there are no visible cracks in welds
or structure and there are no signs of
deformation.
- Ensure all hoses are properly tightened and
there is no evidence of hydraulic leakage.
• Cylinders (B)
- Ensure all cylinders are properly secured
and there are no loose or missing parts
and there is no evidence of damage.
- Ensure all ttings and hoses are properlu
tightened and there is no evidence of
hydraulic leakage.
- Ensure all pins and bushings are secures
and properly tightened.
-
• Wear Pads (B)
- Ensure all bolts are tight, there is no
visible damage to the wear pads and that
no parts are missing.
Rotary Actuator
Jib
Boom
Lift Cylinder
Power Track
Wear Pad
Wear Pad