3-5
SPINNER Werkzeugmaschinenfabrik GmbH
SM-2-12/02
Description, Transportation, Installation instructions
3.5 Transportation of the packed machine
The machines are delivered as shown in the figures below. Only transport the good with a
lift truck of appropriate length! We recommend to unpack and install the machine only on
the installation site. Lift the machine carefully from the pallet.
Figure 3-1: Transportation of the grinding machine
THE MACHINE SHOULD SET DOWN WITH EXTREME CARE!
MAKE SURE THAT THE TRANSPORTATION GOOD DOES NOT
FALL!
Weight: about 150kg
Weight: about 50kg