Chapter 3. System Installation
This chapter provides information on connecting the various output and input terminals of your Ranger
Converter 3000 system.
3.1. Physical Installation
The physical installation of the Ranger Converter 3000 System involves the following procedures.
• Installing the Ranger Converter 3000 Board in the Cabinet
• Connecting the Ranger Converter 3000 to 24VAC and Ground
• Connecting the Master Valve
• Connecting the Main Controller Output to Ranger Converter 3000 Station Inputs
• Connecting the Flow Input and Flow Output
• Connecting the Alarm Output
• Connecting the Two-wire
• Connecting Decoders for Programming
• Connecting the Ranger Converter 3000 Extender to the Ranger Converter 3000 Board
In the following, each of these procedures are depicted in simple illustrations. Turn to the Ranger
Converter 3000 Installation diagram at the end of this chapter for a full overview.