Chapter Five – Maintenance Procedures – Litter
94
5.1 REMOVAL OF LITTER ACCESS PANELS (CONTINUED)
6. For easier access, be sure the Fowler has been moved up to approximately 30. Using a Phillips screwdriv-
er, remove the two screws holding panel #3 to the litter. Lift panel #3 up and out to remove it from under-
neath panel #5 and off the litter.
NOTE
Midsection panel #5 does not need to be removed for routine servicing of the bed.
7. Using a 1/4” nut driver, remove the 4 screws securing panel #4.
8. Lift up on panel #4 and lay it toward the head end of the bed.
9. Reverse the above steps to reattach the panels.
CAUTION
Be sure ground screw is reinstalled in location shown in the illustration below.
3
4
5
HEAD END
GROUND SCREW