21
The accessories shown in above figures are for reference only. The product re-
ceived may differ.
5.2.2 Product Inspection
• Check whether the product received is the ordered one.
• Check that the scope of delivery is consistent with the contract against the packing list.
• Visually check the product for any damage.
If any problems are found or there is any question, please contact the forwarding company
or SUNGROW.
Only install the product when it is complete and intact.
Before installation, ensure that:
• The product is in good condition, without any damage.
• The product and all internal equipment are intact, without any damage.
5.3 Installation Environment Requirements
5.3.1 Installation Site
• The climate environment and geological conditions, such as stress wave emission and
underground water level, should be fully considered when selecting the installation site.
• The installation site should be dry and well ventilated.
• There should be no trees around the installation site to prevent branches or leaves blown
off by heavy winds from blocking the door or air inlet.
• The installation site should be away from areas where toxic and harmful gases are con-
centrated, and free from inflammable, explosive, and corrosive materials.
• The installation site should be far away from residential areas to avoid noise.
5.3.2 Foundation
• The soil at the installation site should be compact. It is recommended that the relative
density of soil at the installation site be no less than 98%. Take relevant measures to en-
sure a stable foundation in case of loose soil.
• The foundation pit must be compacted and filled to provide sufficient and effective sup-
port for the product.
• The foundation should be higher than the horizontal ground to prevent the product base
and the interior from rain erosion.
• The cross-sectional area and height of the foundation should meet the requirements.
• Cabling should be considered when building the foundation.
System Manual 5 Mechanical Mounting