22
Pre-bury the threading pipe at the bottom of the foundation according to the location of
the cable inlet holes at the bottom of the product.
A drainage system is necessary to prevent the bottom or internal equipment of the prod-
uct from being soaked in water during the rainy season or during heavy rainfall.
The dregs excavated during foundation construction should be removed immediately to
avoid the latter impact on hoisting.
Pre-bury the channel steel.
5.3.3 Installation Spacing
To ensure better heat dissipation and facilitate later maintenance, reserve enough space
around the installation site.
5.4 Hoisting and Fixing
5.4.1 Preparation Before Hoisting
Professional cranes must be used and must be operated by qualified personnel.
Otherwise, personal injury or product damage may occur!
Improper hoisting may cause personal injury!
It is strictly prohibited to stand within 5m - 10m outside the operating area (i.e.,
under the boom and the hoisted machine) to avoid casualties.
Professional cranes must be used and must be operated by professional
personnel.
Stop hoisting in the event of severe weather, such as heavy rain, thick fog, or
strong wind.
5 Mechanical Mounting System Manual

Table of Contents

Other manuals for Sungrow MVS4480-US

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Sungrow MVS4480-US and is the answer not in the manual?

Sungrow MVS4480-US Specifications

General IconGeneral
BrandSungrow
ModelMVS4480-US
CategoryInverter
LanguageEnglish

Related product manuals