SINGLE PHASE HI 10/12kW | User Manual52
Concerning the detailed next gures:
1. Tick this box to not export power back to the grid (the CT coil will detect power owing back to the grid
and will reduce the power of the inverter only to supply the local load).
2. Tick this box if you wish to export your solar power back to the grid.
3. Tick this box if you only want to supply power to the load side of the inverter.
4. ‘Zero Export Power’ is the amount of power owing from the grid to the inverter. Set this value to ’20 -
100W’ to instruct the inverter to always take the prescribed amount of power from the grid to minimise
the tripping of sensitive pre-paid electricity meters if ‘Reverse Power Detection’ occurs.
5. This controls the maximum overall power, both to the ‘Load’ and ‘Grid’ ports combined. It is set to Low if
an ‘over-current’ fault occurs.
6. Tick this box if you wish to set the solar panels to give power to the ‘Load’. If you untick this box, the solar
will send power to charge the batteries.
Set the unit to charge the battery from the grid or generator ticking ‘Grid’ or ‘Gen’ and set what times this
needs to occur.
Set the time to discharge the unit to the load or export to the grid by unticking ‘Grid’ and ‘Gen’.