EasyManua.ls Logo

SUNWARD SWE90UF-2PB - 3.2 CAB

SUNWARD SWE90UF-2PB
183 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SWE90UF-2PB Operation & Maintenance Manual
43
2.1 TRANSPORT
2.1.1 General Transport Instructions
Before using a trailer to transport machine, contact local traffic department to confirm relevant
regulations, make sure that machine’s overall length, width, height and weight are within allowed
spec.
If there are any dimensions out of spec, obtain special permission from relevant government
agencies or dismantle the machine into smaller unit to transport.
Select proper transportation tools according to machine’s weight, length, width and height.
Survey the traffic condition for transportation in advance, e.g. road condition and width, height of
bridges and tunnels as well as the limits of weight and traffic regulation etc.
Please note:
Transportation weight and dimension of the machine may change with different
configuration of the front device and attachments.
2.1.2 Transport Specification
The details of machine dimension are showed as below.
See transport dimension in chapter 6, technical specification.
2.1.3 Driving Onto or Off a Platform Trailer
Warning
When loading or unloading, do not go at idle
speed mode to prevent sudden change in speed.

Table of Contents

Related product manuals