EasyManua.ls Logo

Sunways AT 5000 - Page 38

Sunways AT 5000
142 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
38
Pin assignment
1
2
4
3
1 = N
2 = L1 (feed-in phase)
3 = L2 (monitoring phase)
4 = L3 (monitoring phase)
= PE (protective earth conductor)
4. Screw plug housing to plug. To do
this, press the outer ring of the plug
toward the plug housing.
Tightening torque: 1-2 Nm.
5. Tighten the cable gland.
Make sure the line is provided with a
strain relief device. When using cables
with a diameter < 16 mm, the line must
be relieved just behind the connector.
Tightening torque for cable sheath
diameters from
13 to 20 mm = 6 to 8 Nm

Table of Contents

Related product manuals