1 = N
2 = L1 (feed-in phase)
3 = L2 (monitoring phase)
4 = L3 (monitoring phase)
= PE (protective earth conductor)
4. Screw plug housing to plug. To do
this, press the outer ring of the plug
toward the plug housing.
Tightening torque: 1-2 Nm.
5. Tighten the cable gland.
Make sure the line is provided with a
strain relief device. When using cables
with a diameter < 16 mm, the line must
be relieved just behind the connector.
Tightening torque for cable sheath
diameters from
13 to 20 mm = 6 to 8 Nm