48
The operating LED lights up in accor-
dance with the operating state.
The commissioning menu opens when
the solar inverter is connected for the
first time.
Switching off
1. Disconnect the solar generator side
by quickly opening the DC load break
switch (switching position 0)
2. Open the grid connection by switching
off the circuit breaker.