EasyManua.ls Logo

Suzuki LT-Z90K7 2007 - Installation

Suzuki LT-Z90K7 2007
252 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-30 CHASSIS
INSTALLATION
Install the handlebars in the reverse order of removal. Pay atten-
tion to the following points:
Apply adhesive agent to the handlebar right and left end and
right and left grip inner wall.
HANDLE GRIP BOND (commercial available)
Align the punched mark
A
on the handlebars with the mating
surface
B
of handlebar holder.
First tighten the bolts
1
to the specified torque, and then
tighten the bolts
2
to the specified torque.
" Handlebar clamp bolt: 25 N·m (2.5 kgf-m, 18.0 lb-ft)
NOTE:
The higher portion of handlebar holder must face forward, so
that the clearance C of holder is in back of the handlebars.
Align the punched mark
D
on the handlebars with the mating
surface
E
of left brake lever holder
3
.
Align the punched mark
F
on the handlebars with the mating
surface
G
of left handle switch
4
.
Apply handle
grip bond.
Apply handle
grip bond.
Handlebars
Forward

Table of Contents

Related product manuals