EasyManua.ls Logo

Suzuki LT-Z90K7 2007 - Semi-Conductor Equipped Part; Battery; Connecting the Battery; Wiring Procedure

Suzuki LT-Z90K7 2007
252 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ELECTRICAL SYSTEM 6-3
SEMI-CONDUCTOR EQUIPPED PART
Be careful not to drop the part with a semi-conductor built in
such as a CDI unit and regulator/rectifier.
When inspecting this part, follow inspection instruction strictly.
Neglecting proper procedure may cause damage to this part.
BATTERY
The MF battery used in this vehicle does not require mainte-
nance (e.g., electrolyte level inspection, distilled water replen-
ishment).
During normal charging, no hydrogen gas is produced. How-
ever, if the battery is overcharged, hydrogen gas may be pro-
duced. Therefore, be sure there are no fire or spark sources
(e.g., short circuit) nearby when charging the battery.
Be sure to recharge the battery in a well-ventilated and open
area.
Note that the charging system for the MF battery is different
from that of a conventional battery. Do not replace the MF
battery with a conventional battery.
CONNECTING THE BATTERY
When disconnecting terminals from the battery for disassem-
bly or servicing, be sure to disconnect the
-
battery lead
wire, first.
When connecting the battery lead wires, be sure to connect
the
+
battery lead wire, first.
If the terminal is corroded, remove the battery, pour warm
water over it and clean it with a wire brush.
After connecting the battery, apply a light coat of grease to the
battery terminals.
Install the cover over the
+
battery terminal.
WIRING PROCEDURE
Properly route the wiring harness according to the “WIRING
HARNESS ROUTING” section. (
7-14)
INCORRECT

Table of Contents

Related product manuals