3-8 ENGINE
• Install the muffler
3
and exhaust pipe
4
.
• Tighten the muffler mounting bolt and exhaust pipe bolt to the
specified torque.
" Muffler mounting bolt: 23 N·m (2.3 kgf-m, 16.5 lb-ft)
Exhaust pipe bolt: 23 N·m (2.3 kgf-m, 16.5 lb-ft)
• Tighten the muffler clamp bolt to the specified torque.
" Muffler clamp bolt: 12 N·m (1.2 kgf-m, 8.5 lb-ft)
• Install the carburetor assembly. (
4-13)
• After remounting the engine, route the wiring harness, cables
and hoses properly. (
7-15)
• Adjust the following items.
* Engine oil (
2-10)
* Throttle cable play (
2-13)
* Engine idle speed (
2-13)
* Drive chain slack (
2-18)
The removed gasket must be replaced with a new one
to prevent exhaust gas leakage.