EasyManua.ls Logo

Swan Analytical Instruments AMI - 4 Instrument Setup; Programming

Swan Analytical Instruments AMI
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
AMI Sample Sequencer
Instrument Setup
A-96.250.661 / 120418 45
4. Instrument Setup
After the installation according to checklist has been finished, ad-
just the sample flow.
Without back
pressure
regulator
1 Open all main sample taps.
2 Open all flow regulating valves at the sample inlets of the
AMI Sample Sequencer.
3 Adjust the sample flow of each sample inlet to min. 5 l/h.
4 Check all sample inlets for leakage.
5 If leakage occurs, stop sample flow and repair it.
6 Repeat step 1 to 4.
7 Switch on power.
With back
pressure
regulator
The SWAN Back Pressure Regulator is used to stabilize, reduce
and control the flow rate of sample for water analyzing systems. If a
back pressure regulator is installed adjust the sample flow as fol-
lows:
1 Open all main sample taps.
2 Open all flow regulating valves at the sample inlets of the
AMI Sample Sequencer.
3 Open the shut off valves on the back pressure regulators.
4 The sample flow of each sample inlet should be min. 5 l/h.
5 Check all sample inlets for leakage.
6 If leakage occurs, stop sample flow and repair it.
7 Repeat step 1 to 5.
8 Switch on power.
4.1. Programming
Programming Program all parameters for instrument operation (sequence,
alarms). See Program Overview, S. 55 and Program List and Ex-
planations, S. 58.

Table of Contents

Related product manuals