Revision G Issued May 2022
Site Preparation Checklist
RSA-G2 Solids Analyzer
Sufficient bench space for instrument, computer, Power Supply Enclosure, and FCO Enclosure:
Length: 2.1 m (7 ft)
Depth: 76 cm (30 in)
Distance from the wall: 20 cm (8 in)
Instrument power:
180–264 VAC, 47–63 Hz. In the US, an L6-20 outlet is required.
ACS power:
207–252 50 Hz 216–252 60 Hz
Computer meets all hardware requirements
I have two network cards installed on the computer to be able to connect to both the
corporate LAN and the instrument.
Computer meets all software requirements
Customer’s IT personnel has provided Administrative privileges on the controller computer
The Customer’s IT personnel will be on site the day of installation
Air Supply:
Pressure is 100 psig (0.7 MPa)
Available flow rate is 9.5 scfm (270 L/min)
Dew point is -10°C or better
Liquid Nitrogen Controller:
Customer must provide 160 L (or larger) Liquid Nitrogen tank with a pressure of 14–22 psig (95–
150 kPa gauge)
The Customer assumes responsibility for any damage that occurs when the instrument is moved
by someone other than a trained TA Instruments Service Representative.
I hereby acknowledge that all utility requirements have been met per the checklist above and that they will be
ready at the agreed time of installation.
If all utility requirements are not met at the agreed time of installation, additional charges may be incurred for a
Customer
DD MM YYYY
Please send a signed copy of the completed checklist to your local Service representative.