The digging capacity increases when the
bucket’s link arm installation position is
switched from (A) to (B). However, this
shortens the bucket stroke.
Struck capacity (SAE) :
0.210 m
3
(0.275 cu. yd.)
Rated capacity (SAE) :
0.261 m
3
(0.341 cu. yd.)
Changing the Link Arm
Installation Position
Refer to page 148 “Replacing the Bucket” in
the manual.