EasyManuals Logo

Takeuchi TB153FR User Manual

Takeuchi TB153FR
239 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #97 background imageLoading...
Page #97 background image
95
OPERATION
Operating Procedures
3. Once the mound is low, remove the dirt
from the top. If the load on the body is too
heavy, adjust by raising or lowering the
dozer blade.
Digging Side Ditches
Use the boom swing function to dig side
ditches as shown in the diagram.
Loading
When loading dirt in a truck, starting from
the back of the truck’s bed makes for easier
loading and increases the amount of dirt that
can be loaded.
Also, use a small slewing angle for greater
efficiency.
Leveling
1. Bring the hoe attachment close to the
body.
2. Gradually remove the dirt from the side of
the mound.
E4D052
60°
75°
E4D053

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Takeuchi TB153FR and is the answer not in the manual?

Takeuchi TB153FR Specifications

General IconGeneral
Engine MakeYanmar
Engine Model4TNV88
Tail Swing TypeZero Tail Swing
Maximum Reach5, 570 mm
Max Reach Ground Level5, 570 mm
Transport Width2, 000 mm
Transport Height2, 600 mm

Related product manuals